20MW production line
Ecoprogetti’s team is proud to announce the delivery of the first 20MW automatic module production line to Indonesia!
The line will be installed in the area of Jakarta with the purpose of serving the local Indonesian communities. Thanks to more than 30 years of experience Ecoprogetti is able to suggest and supply the right level of automation to each different Emerging country, according to the local features, man power cost and working habits, in order to permit the investor to have the fastest payback as possible.
In order to optimize logistics and cashflow management a 20MW line is the perfect size for a starting business; the line provided by Ecoprogetti is very flexible among the best features are:
The Indonesian solar market does have its interest in renewable energy and there is a great growing potential laying on Off Grid sites. Seen the undersized electricity network, the best solution for Indonesian’s geographical situation are indeed the off grid sites, aimed to self-sustain the locals and domestic markets.
Up to now there are still 10000 isolated villages , almost 15 million people in the country who have not enjoyed electricity properly. Therefore, Indonesia President wants the electricity program to run all area with solar panels. The installation of Ecoprogetti’s production line is expected to help an additional target of 20 megawatts of electric power by 2019.